Last month we uplifted 3,000 MT (102 trucks) of copper, blisters and cathodes over a period of 24 days. Our Road Freight Operations teams in Dar es Salaam and Solwezi planned out the flow, loading and dispatch of trucks to and from the mine in Solwezi.

The 2,170 Km trip averaged a 10 day transit time on both our own as well our subcontracted trucks, showing harmony in the standard operating procedures for this shipment. We appreciate the job well done by our team down at the mine, ultimately showcasing good loading efficiency and short turnaround time in Solwezi.

We look forward to another month of uplifting copper from Solwezi.